1 2 3Get Started:This box includes:• Alicat device• NIST traceable calibration certificate• Power and communication cable• Optional accessories (filters, fittings)PowerThe battery is shippedwithout a charge. Oncefully charged, it lastsup to 18 hours. Use thesupplied power cablewith an outlet adapterfor fastest charging.TareBefore installingthe device into yourprocess, press theTARE FLOW buttonon the main screen.This will zero out(tare) your unit.You're Ready to Connect:ModelSeries Maximumline pressure Maximumdifferential pressureMB, MBS 145 PSIG 75 PSIDMWB 45 PSIG 10 PSIDMBQ 305 PSIG 75 PSIDGas and UnitsSelect your gas from the menu:MENU → BASIC CONFIG → GAS.Ensure the proper units areselected. Press the button nextto the parameter you want tochange on the main screen,then SET DEVICE ENG UNITS.4 Ensure the flow path is thesame direction as the flowarrow shown on your unit. 5 Verify the requirements forpressure above, and connectthe device to your process.DOC-MANUAL-MB-QUICKRev 0 • 2020-07-06Download the full manual: Alicat.com/manualsAnnual Calibration • Troubleshooting • QuestionsConsult your Alicat manual or contact us at 520-290-6060 or info@alicat.com