Manual version: APW100-20200316 BOM: 3123A1Y9iiIMPORTANT:An M9016-V gateway requires a minimum of three switching fabric modules, and slots 10 and 11must be installed with switching fabric modules.4 LEDsThe module provides LEDs to show its operating status.Table 2 LED descriptionLED Status DescriptionStatus LEDsRUN ALMFlashing (0.5 Hz) Off The switching fabric module is operating properly.Off On The switching fabric module is faulty.Flashing (0.5 Hz) On The temperature of the switching fabric module hasexceeded the upper or lower limit.Off Off The switching fabric module has not started.On Off The switching fabric module is starting up.5 Installing and removing the moduleCAUTION:Wear a reliably grounded ESD wrist strap when installing and removing the module.5.1 Installing the module1. Face the rear panel of the device.2. Remove the filler panel from the target slot.This example installs the module in slot 10 on an M9016-V gateway.3. Place the module horizontally with the component side facing up. Fully open the ejector leversof the module and then gently push the module into the slot along the guide rails.4. Continue to push the module on the middle part of the front panel until the ejector levels touchthe slot edges.